
New compressor module at Kvitebjørn for Statoil
The project consists of detail engineering, construction and installation of a new compressor module, as well as integrating the module with existing facilities at the Kvitebjørn platform. The compressor module will increase the oil recovery rate and accelerate the production at the Kvitebjørn field by allowing production at a lower wellhead pressure. The contract covers engineering services, procurement, fabrication, offshore installation and completion (EPCIC) and runs till first quarter 2014.

New control systems for diesel engines at Statfjord B/C for Statoil
The EPCI contract (Engineering, Procurements, Construction and Installation) includes modifications in order to install new control systems for diesel engines for generators and firewater pumps (6 engines per platform). The project also includes preparations for and assistance regarding completion of the system.

Reinforcement of Cellar Deck at Eldfisk Bravo for ConocoPhillips
Due to subsidence of the seabed below Eldfisk Bravo and increased wave criteria in the Ekofisk/Eldfisk area it has become necessary to reinforce the cellar deck of the platform. Bergen Group Rosenberg AS has performed a FEED study for this assignment, and is currently at the implementation stage (EPCI). The cellar deck of the platform consists of a double base that contains tanks for drinking water, diesel and drilling fluids. Extensive structural analyses are required to find the optimal reinforcement solutions. In addition the project will remove or reconstruct vulnerable structures and piping systems underneath the deck. New pumping solutions for tank drainage and circulation of drinking water are part of the project.





